img(height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2939831959404383&ev=PageView&noscript=1")

Donmar Warehouse

An informal ‘work-in-progress’ feel

Credit: Philip Vile

Haworth Tompkins for Donmar Warehouse

Contract value £3.1m. GIA: 1171m2

This conversion of a five-storey warehouse is the new administrative home for the Donmar, comprising a range of education spaces, library, offices, rehearsal, casting studios and practice rooms plus informal break-out areas. In typical form, the architect has stripped the building back to its raw materials revealing original brick, timber and the occasional rusting lintel, giving an informal ‘work-in-progress’ feel.

  • Credit: Phillip Vile
  • Credit: Philip Vile
  • Credit: Philip Vile
  • Credit: Philip Vile
  • Credit: Valerie Bennett
  • Credit: Philip Vile
  • Credit: Philip Vile
  • Credit: Philip Vile
  • Credit: Philip Vile
  • Credit: Philip Vile
12345678910

Two major new insertions – the stair and rehearsal studio – are made entirely of timber. The former, a colour-soaked collaboration with artist Antoni Malinowski, is dramatically lit and gives a strong sense of theatricality, while the rehearsal room is a fully equipped, double-height space. Interiors were designed with the set designers for the Donmar and are a symphony of urban retro. This project is a fantastic addition to Covent Garden’s cultural and architectural treasures.


See other winners in the RIBA Regional Awards 2015 – London

Latest articles

In association with Hilti

RIBAJ Designing and Specifying for the Building Safety Act Seminar

  1. Products

Join RIBAJ and Hilti at the 'Designing and Specifying for Fire Safety' seminar in Manchester.